Cost comparison small sewage treatment plants

In the long run, Clearfox nature is the most economic solution compared to all pre-assembled small sewage treatment plants on the market.
After 10 years, the buyer

has cost savings up to € 750 for investments
up to € 2940 for the operation!

If we calculate an interest rate of 3% on the saved sum, savings of the operational costs rise

up to € 3450!

In addition, recycling costs for plastic tanks are considerably lower than for concrete tanks.
Clearfox nature can be recycled entirely!

For the sizes for 8 PE and 16 PE, the savings will increase accordingly.

the small sewage treatment plants cost comparison as pdf

can be downloaded here cost comparison small sewage treatment plants

 KostenquelleBelebungs- und
SBR-Anlage
Nachrüstung
bestehender Gruben
FestbettanlageBiofiltrations-
anlage
Pflanzenklär-anlageClearfox natureEinsparung
minimal
Einsparung
maximal
  
1Investitionskosten
1.1Kleinkläranlage komplett3.949,00 €1950,00 €4.150,00 €
4.500,00 €
2.600,00 €
4.350,00 €
1.2Transport0,00 €
0,00 €
0,00 €
0,00 €
0,00 €
0,00 €
1.3Erdbau2.000,00 €
900,00 €
2.000,00 €
2.000,00 €
4.500,00 €
2.000,00 €
1.4Einbau/Dichtheitsprüfung0,00 €
450,00 €
0,00 €
0,00 €
0,00 €
0,00 €
1.5Abnahme300,00 €
300,00 €
300,00 €
300,00 €
300,00 €
300,00 €
1.6Inbetriebnahme0,00 €
0,00 €
0,00 €
0,00 €
0,00 €
0,00 €
Summme6.249,00 €
3.600,00 €
6.450,00 €
6.800,00 €
7.400,00 €
6.650,00 €
-2.882,00 €
918,00 €
2Betriebskosten jährlich
2.1Energiekosten95,00 €
95,00 €
80,00 €
0,00 €
0,00 €
0,00 €
2.2Instandhaltungskosten150,00 €
150,00 €
100,00 €
175,00 €
50,00 €
50,00 €
2.3Schlammentsorgung140,00 €
140,00 €
140,00 €
80,00 €
80,00 €
80,00 €
2.4Wartung180,00 €
180,00 €
180,00 €
180,00 €
90,00 €
180,00 €
Summe565,00 €
565,00 €
500,00 €
435,00 €
220,00 €
310,00 €
-90,00 €
255,00 €
3Betriebskosten akkumuliert nach 10 Jahren
6.402,79 €
6.402,79 €
5.662,22 €
4.858,39 €
2.457,12 €
3.462,30 €
-1.005,18 €
2.940,48 €
4Betriebskostenersparnis von Clearfox nature gegenüber anderen Systemen nach 10 Jahren bei Anlage der Ersparnis mit 3% Verzinsung
3.450,54 €
3.450,54 €
2.581,06 €
1.640,54 €
-1.181,19 €
0,00 €
-1.181,19 €
3.450,54 €

explanation:

A negative number suggests that there are no savings through the use of CF nature compared to other systems

The numbers include VAT. The numbers are average prices in Germany and may vary depending on region and country

1.1.) Pre-chamber + biological stage + post treatment depending on the system for 4 PE; for retrofitting costs for kit parts, costs for planning and application documents (up to € 500) and expert assessment (€ 400) must be added

1.2.) Transport is included in the price for most manufacturers, for distances > 100km, however, it generally must be added

1.3.) Costs are only indicative and may vary considerably depending on the region; retrofitting costs may arise when making the present chamber leak-proof

1.4.) Costs for crane depending on the system, when retrofitting costs for installing the kit + leak test

1.5.) The approval is done by the responsible authority depending on the country and state and is independent of the type of plant

1.6.) Commissioning is usually included in the price, ClearFox is Plug and Play

2.1.) Energy costs for magnetic-valves, blowers, pumps, control unit, malfunctions and telemetric depending on the system € 40-150
Calculation: Consumption in kWh/a x energy costs in €/kWh, assumption: € 0.29/kWh

2.2.) Maintenance costs include costs for wear parts (e.g. pump € 150/5y, blower € 375/10y, gasket kit € 40/2y, magnetic-valve € 50/7y, control unit € 675/12y) and expenses for replacement and repair at bio filters: Cleaning of the filter material € 150/2y, replacement+disposal € 500/5y (partly included in a service agreement). The costs for spare parts are based on prices to date and may vary considerably depending on the market and the manufacturer

2.3.) Primary sludge + secondary sludge depending on production, € 40.00/m3 + call-out charge € 20.00 average production: For SBR plants / aeration plants / fixed-bed plants: 3m3/y; biofilm plant with filtration / constructed wetlands for wastewater treatment / Clearfox nature: 1.5m3 per year (no secondary sludge)

2.4.) Service intervals depend on the building-authority approval, generally 2x/y for techn. plants; 1x/y for natural treatment plants. Assumption: € 90.00/service plus spare parts plus fault-clearing service blackout, defects, repairs, defect information

3.) Annual costs after 10 years with an increase in prices of 2%/y and increase in energy costs of 3.5%/y. The increase in prices are assumptions and may vary considerably depending on the market

4.) Sources for assumptions: Auth and Seyler, Bayer. Landesamt für Umwelt; Straub, Hochschule Lausitz, Cottbus; Herstellerangaben; BDEW (2015)